Denali Water Solutions LLC collects organic byproducts from meat, dairy, food, pet food and other similar processing plants located in Missouri, Arkansas, Illinois, Iowa, Kansas, Kentucky, Oklahoma and Tennessee. Historically, the process wastewater and wastewater treatment residuals were transported from the generation facilities to one of several of Denali's Missouri locations for storage before land applied as soil amendments to farmland. These large storage basins are in the process of being properly closed.
Currently, Denali is proposing several projects consisting of constructing storage tank facilities to provide inclement weather storage for materials licensed for land application during periods of inclement weather, or when land application is otherwise precluded. More information about these proposed projects is provided below under Other Locations.
If a concerned citizen observes improper land application or runoff of applied material that is impacting waters of the state, they should contact the appropriate department regional office.
Compliance History
At this time, Denali has committed four violations that have not been resolved: Operating and maintaining a water contaminant source without a Missouri State Operating Permit (Gideon, Evans and Callao lagoons) and land application of process wastewater. The department is working to resolve the violations through formal enforcement action.
- Denali Water Solutions LLC Referral Notice of Violation No. SW223, Sept. 7, 2022
- Denali Water Solutions LLC Referral Notice of Violation No. 230025, April 6, 2023
- Denali Water Solutions LLC Abatement Order on Consent (2023-WPCB-1832), July 10, 2023
- Denali Water Solutions LLC Referral Notice of Violation No. 230060, Oct. 20, 2023
- Denali Water Solutions LLC Notice of Violation No. SW230079, Nov. 29, 2023
- Denali Water Solutions LLC Abatement Order on Consent (2024-WPCB-1875), Jan. 31, 2024
Note: Department-collected penalties are paid to the school district in the county in which the violations occurred; the department does not retain any collected penalties.
Callao Lagoon
On May 17, 2023, Denali submitted a wastewater operating permit application for a land application permit and associated Waste Management Plan.
Evans Lagoon
On May 17, 2023, Denali submitted a wastewater operating permit application for a land application permit and associated Waste Management Plan on July 18, 2023, for the Denali-Evans Lagoon (MO-0140325).
- Denali-Evans Storage Lagoon Construction and Operation Plan, September 2019
- Denali-Evans Lagoon Application for Construction Permit-Wastewater Treatment Facility, Oct. 1, 2019
- Denali-Evans Lagoon, Form A-Application for Nondomestic Permit under Missouri Clean Water Law, May 17, 2023
- Denali-Evans Lagoon Management Plan for the Land Application of Organic Residuals, July 18, 2023
On the basis of preliminary staff review and applying applicable standards and regulations, the department proposed to deny the operating permit application. The department invited the public to review and offer written comments on the proposed action.
On Aug. 23, 2024, the department accepted Denali's request to withdraw the permit application.
Gideon Lagoon
On May 17, 2023, Denali submitted a wastewater operating permit application for a land application permit for the Denali-Gideon Lagoon (MO-0140309).
- Denali-Gideon Lagoon Geohydrologic Evaluation, May 7, 2020
- Denali-Gideon Lagoon, Form A-Application for Nondomestic Permit under Missouri Clean Water Law, May 17, 2023
On the basis of preliminary staff review and applying applicable standards and regulations, the department proposed to deny the operating permit application. The department invited the public to review and offer written comments on the proposed action.
On Aug. 23, 2024, the department accepted Denali's request to withdraw the permit application.
Jacksonville Basin
On June 21, 2023, Denali submitted a wastewater operating permit application for a land application permit and associated Waste Management Plan.
- Denali-Jacksonville Storage Basin Application for Nondomestic Permit Under Missouri Clean Water Law, June 21, 2023
- Denali-Jacksonville MO 2 Lagoon CR 1770 MoDNR Geohydrologic Evaluation, July 19, 2022
- Denali-Jacksonville Storage Lagoon Plans and Specifications, November 2022
- Denali-Jacksonville Storage Lagoon Maps, Nov. 15, 2022
- Denali-Jacksonville Exempted Materials List
On the basis of preliminary staff review and applying applicable standards and regulations, the department issued a draft operating permit for public review and comment. The department invited the public to review and offer written comments on the draft permit and scheduled a public hearing as an opportunity for the public to provide verbal comments to the department. A final permit determination has not yet been issued.
Other Locations
Public comment periods are currently underway for both the El Dorado and Wentworth locations. The department will hold two public hearings about the draft permits. More information is available in the public comment period links below.
El Dorado No. 1 Inclement Weather Storage Facility
Wentworth Inclement Weather Storage Facility
- Denali-Wentworth Storage Tank Draft Missouri State Operating Permit Public Comment Period, May 22, 2026 to July 1, 2026
- Draft Missouri State Operating Permit MO0140953, May 22, 2026
- Denali-Wentworth Storage Tank, Form A-Application for Nondomestic Permit under Missouri Clean Water Law, July 1, 2025
- Denali-Wentworth Inclement Weather Storage Facility Plan, Feb. 19, 2026
- Denali-Wentworth Tank Secondary Containment Plan, Jan. 20, 2026
Phelps Storage Tank and SEMO
Denali withdrew the applications for the Phelps Storage Tank and SEMO. Denali may submit new applications for these sites in the future or incorporate them into other applications.