The following table contains electronic copies of all currently effective site-specific wastewater permits — not master general permits — issued by the department. These facilities have been authorized to either discharge to waters of the state, or to operate a no-discharge wastewater treatment facility. These permits are written to be site-specific, issued to that one location to reflect the unique nature of the wastewater or the receiving water. The list includes Concentrated Animal Feeding Operation (CAFO) permits, stormwater permits, wastewater permits and underground injection control well permits. The permits are consistent with applicable water quality standards, effluent standards or treatment requirements or suitable timetables to meet these requirements (10 CSR 20-7.015 and 7.031).

The department will add each site specific wastewater permit as it is issued. If you cannot find the information you are looking for, please submit an Open Records/ Sunshine Law Request.

To sort the table below by field, click on the column headings in the table. You can also enter criteria in the search boxes to search for a specific wastewater permit.

*This is an "and" type search. All search criteria you enter must be met for the permit to appear in the results. If the permit you are searching for is not listed in the results, try again using less criteria.

Effective Date Between
Permit Number Applicant/ Facility County Effective Date Expiration Date Type
MO0119741 Rye Creek Landfill Adair Operating
MO0114120 Lakewood Care Center Jefferson Operating
MO0091413 Circle C Mobile Home Park Franklin Operating
MO0118133 ContiGroup-Scott/ Colby Farms Daviess Operating
MO0123528 Willowbrook Subdivision Butler Operating
MO0087718 St. Charles County Public Water Supply District No. 2-Water Treatment Plant St. Charles Operating