Permits are required to build, erect, alter, replace, operate, use or maintain existing point sources of water pollution. A master general permit is one permit issued to multiple locations where activities are similar enough to be covered by a single set of requirements. However, most wastewater permits are site-specific, meaning one permit is issued to one location to reflect the unique nature of that specific wastewater, stormwater or the receiving water. 

As a permit nears its expiration, it is redrafted, modified if needed and made available for public review and comment. The department reviews all public comments before making a decision about the permit.

If a permittee submits a timely and sufficient application to renew a permit and, through no fault of the permittee, the department is unable to issue the renewed permit before the current permit expires, Code of State Regulations 10 CSR 20-6.015(10)(C) allows the permit to be administratively continued. The terms and conditions of the expired permit remain in effect until the department issues or denies the permit renewal.

Currently Effective Permits

The following table contains electronic copies of all currently effective site-specific wastewater permits — not master general permits — issued by the department. This includes Concentrated Animal Feeding Operation (CAFO) permits, stormwater permits, wastewater permits and underground injection control well permits. These facilities have been authorized to either discharge to waters of the state, or to operate a no-discharge wastewater treatment facility. The department adds each site specific wastewater permit as it is issued.

To sort the table below by field, click on the column headings in the table. You can also enter criteria in the search boxes to search for a specific wastewater permit. If you cannot find the information you are looking for, please submit an Open Records/ Sunshine Law Request.

Permits issued before April 24, 2026, have been archived as per Missouri’s Website Content Standards. The Missouri Department of Natural Resources is aware that these permits do not meet current WCAG-Level AA accessibility standards. To request an accessible version, please fill out the department’s Report Accessibility Issues form and a member of our team will be in contact with you.

*This is an "and" type search. All search criteria you enter must be met for the permit to appear in the results. If the permit you are searching for is not listed in the results, try again using less criteria.

Effective Date Between
Permit Number Sort descending Applicant/ Facility County Effective Date Expiration Date Type
MOGC00710 Oaks of Edgewood 13-20 Jackson Construction
MOGC00711 Southfork Estates Phase 1 Christian Construction
MOGC00713 Franklin County Public Water Supply District No. 3-Victoria Gardens Wastewater Treatment Plant Franklin Construction
MOGC00714 Woodland Heights Warren Construction
MOGC00715 Bear Ridge Jefferson Construction
MOGC00717 Branson Compton Drive Wastewater Treatment Plant Taney Construction
MOGC00718 City of Rogersville Webster Construction
MOGC00720 Liberty North Plat 4 Boone Construction
MOGC00722 Natural Bridge Single-Family Subdivision Christian Construction
MOGC00724 Finley Crossing Christian Construction
MOGC00725 MAWC Cahoon Lift Station Bypass Sewer St. Louis Construction
MOGC00726 Running Horse Village Lift Station Platte Construction
MOGC00727 Autumn Ridge 5th Plat Cass Construction
MOGC00728 Meadowbrook Phase 4 Christian Construction
MOGC00729 Timber Run Subdivision Plat 1 Warren Construction
MOGC00730 Cloud 9 Ranch Club Inc. Ozark Construction
MOGC00731 Savers Farm Subdivision Phase 8 Cape Girardeau Construction
MOGC00732 Oasis at Lakeport Miller Construction
MOGC00733 Camp Clark to City of Nevada Vernon Construction
MOGC00734 Douglas Pointe-Moore Trunk Sewer Boone Construction
MOGC00735 Steele Wastewater Treatment Facility Pemiscot Construction
MOGC00736 Eagle Ridge Estates Phase 1 Cass Construction
MOGC00737 Winding Bluffs Second Addition Jefferson Construction
MOGC00738 Moore Fans Building Expansion Linn Construction
MOGC00739 Moore Ranch Estates Phase 5 Lawrence Construction
MOGC00740 Fairview Crossing Phase 1 Clay Construction
MOGC00741 Ridgedale Sanitary Sewer Phase 2 Taney Construction
MOGC00742 West Prairie Lee Jackson Construction
MOGC00743 Pleasant Hill Subdivision Webster Construction
MOGC00744 Fox Crest Trunk Sewer Main Franklin Construction
MOGC00745 Walker Heights Greene Construction
MOGC00746 Zach Nicholas Low Pressure Clay Construction
MOGC00747 London Manor St. Charles Construction
MOGC00748 LXT Hangar 2 and Eastside Development Jackson Construction
MOGC00749 Village South Plat 2 Cooper Construction
MOGC00750 Wilmer Crossing St. Charles Construction
MOGC00751 Boulder Valley Warren Construction
MOGC00752 Mountain Grove West Wastewater Treatment Plant Wright Construction
MOGC00753 Missouri Department of Transportation-Maintenance Facility Cass Construction
MOGC00755 Jaxson Estates Subdivision Plat 8 St. Charles Construction
MOGC00756 Missouri Department of Natural Resources-Lake of the Ozarks State Park Camden Construction
MOGC00757 Boone Ridge Manor Warren Construction
MOGC00758 Missouri Department of Natural Resources-Meramec State Park Wastewater Treatment Facility Improvements Franklin Construction
MOGC00759 Salem Estates Plat 1 Clay Construction
MOGC00760 Nevada Wastewater Treatment Plant Vernon Construction
MOGC00761 Signature Ridge Subdivision Sections 1 and 2 Cole Construction
MOGC00762 Grant City West Sanitary Lagoon Worth Construction
MOGC00763 Nevada Wastewater Treatment Plant Vernon Construction
MOGC00764 Fitz Ridge Subdivision Greene Construction
MOGC00765 Southwest Missouri Rail and Business Park Phase 3 Greene Construction