A facility used to confine inmates who are being legally held as a punishment for a crime they have committed or await trial.

You may need some or all of the following permits for a Prison:

Air icon
Air Intermediate Operating Permit

If your business is required to obtain a Part 70 Operating Permits but accepts voluntary, practically enforcement limitation to reduce emissions to less than 100 tons per year of any regulated pollutant and is less than 10 tons per year of any single hazardous air pollutant and less than 25 tons per year of any combined hazardous air pollutant, you may require an Air Intermediate Operating Permit to address potential air emissions.

Air icon
Air Major Construction Permit Sections (7), (8) & (9)

If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit more than major emission levels of a regulated air containment or construct a new installation or modify an existing major installation and the project has the potential to emit more than the minor levels per year, you may require an Air Major Construction Permit Sections (7), (8) & (9) to address potential air emissions.

Air icon
Air Minor Construction Permit Section (5)

If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit less than major source levels per year; or you plan to construct a new installation or modify an existing major installation and the project has the potential to emit less than the minor levels per year, you may require an Air Minor Construction Permit to address potential air emissions.

Air icon
Air Part 70 Operating Permit

If your business has the potential to emit greater than 100 tons per year of any regulated pollutant, has the potential to emit greater than 100 tons per year of any single hazardous air pollutant, or greater than 25 tons per year of combined hazardous air pollutants, or is required by a New Source Performance Standard or a Maximum Achievable Control Technology, you may require an Air Part 70 Operating Permit.

Water icon
Fuel Spill Cleanup Permit (Petroleum Impacted Water Remediation) MOG940000

If your business discharges wastewater or stormwater associated with petroleum impacted water at any industrial or commercial facility, you must obtain a Petroleum Impacted Water Remediation MOG940000 master general permit.

Water icon
Land Application of Domestic Wastewater Permit MOG823000

If your business is a no-discharge, private or domestic wastewater treatment facility with design flows of less than 50,000 gallons per day and land apply the wastewater, design flows of less than 50,000 gallons per day and plan to land apply the wastewater, you must obtain a Land Application of Domestic Wastewater MOG823000 master general permit.

Agency General icon
Major Water Users

Missouri collects water use data to better understand and manage the state’s water inventory.  A Major Water User is any person or entity that has the capability of producing a large amount of water (100,000 gallons per day or 70 gallons per minute or more) with all their combined wells or surface intakes. This water can be from either groundwater via a well, or surface water from a stream, river, lake, pond, or spring. 

Major Water Users are required by law to report the volume of water used by March 31 of the year following the usage.

Water icon
Phase II Municipal Separate Storm Sewer Systems (MS4) Comprehensive Master General Stormwater Permit MOR04C000

If your business plans to discharge from a regulated Phase II Municipal Separate Storm Sewer Systems, you must obtain a Phase II Municipal Separate Storm Sewer Systems Comprehensive General Stormwater Permit MOR04C000 to address stormwater discharges from the property. This system collects stormwater runoff from roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man-made channels, storm drains from cities, townships, counties, military bases, hospitals, prison complexes, highway departments, universities and more. Learn more about Municipal Separate Storm Sewer Systems (MS4).

Water icon
Phase II Small Municipal Separate Storm Sewer Systems Master General Stormwater Permit MOR040000

If your business plans to discharge from a regulated Phase II Municipal Separate Storm Sewer Systems, you must obtain a Phase II Small Municipal Separate Storm Sewer Systems MORo40000 general permit to address stormwater discharges from the property. This system collects stormwater runoff from roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man-made channels, storm drains from cities, townships, counties, military bases, hospitals, prison complexes, highway departments, universities and more.

Water icon
Public Drinking Water Construction Permit

If your business plans to construct a public water system that will supply drinking water to the public, you must obtain a Public Drinking Water Construction Permit. You must obtain this permit if you also plan to complete the following construction projects to the water system: waterline extensions, waterline replacements, drilling water supply well, construction a storage tank, adding a disinfection system, treatment changes, building a pump station or other improvements or modifications. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Water icon
Public Drinking Water Permit to Dispense

If your business plans to operate a public water system that supplies drinking water to the public, you must obtain a Public Drinking Water Permit to Dispense. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Water icon
Sewer Extension Construction Permit

If your business plans to construct a gravity sewer extension, force main and lift station, you may need a site-specific Sewer Extension Construction Permit. You may also need this permit if you plan to construct a non-earthen flow equalization storage basin at a lift station and an inline storage.

Waste icon
Solid Waste Processing Facility Construction Permit

If your business plans to operate a facility where solid wastes are transferred from one container to another or are processed, you are required to apply for a Solid Waste Processing Facility Construction Permit. Types of processing facilities include incinerator, compost plant, infectious waste, transfer station and material recovery, with or without composting.

Waste icon
Solid Waste Processing Facility Operating Permit

If your business plans to operate a facility where solid wastes are transferred from one container to another or are processed, you are required to apply for a Solid Waste Processing Facility Operating Permit. Types of processing facilities include incinerator, compost plant, infectious waste, transfer station and material recovery, with or without composting.

Water icon
Textile and Apparel/ Printing and Publishing Master General Stormwater Permit MOR130000

If your business produces paper and allied products, textiles and apparel products, printing and publishing operations and paper-only recycling, food and kindred products manufacturing operations, you must obtain a Textile and Apparel/ Printing and Publishing General Stormwater Permit MOR130000 to address stormwater discharges from the property.

Agency General icon
Wastewater Treatment Operator Certification

If you would like to become a licensed wastewater treatment operator including a Concentrated Animal Feeding Operation Waste Management System operator, visit the department's Operator Certification webpage. The department can help provide you with training, examinations, funding vouchers to obtain certification and information about employment opportunities within Missouri.