This business transports people or cargo using aircrafts such as airplanes or helicopters. Missouri boasts nearly 500 aviation facilities, including publicly owned airports. More than 190,000 tons of cargo are transported by air in Missouri each year.
You may need some or all of the following permits for a Air Transportation:
|
Air Intermediate Operating Permit
If your business is required to obtain a Part 70 Operating Permits but accepts voluntary, practically enforcement limitation to reduce emissions to less than 100 tons per year of any regulated pollutant and is less than 10 tons per year of any single hazardous air pollutant and less than 25 tons per year of any combined hazardous air pollutant, you may require an Air Intermediate Operating Permit to address potential air emissions. |
|
Air Major Construction Permit Sections (7), (8) & (9)
If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit more than major emission levels of a regulated air containment or construct a new installation or modify an existing major installation and the project has the potential to emit more than the minor levels per year, you may require an Air Major Construction Permit Sections (7), (8) & (9) to address potential air emissions. |
|
Air Minor Construction Permit Section (5)
If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit less than major source levels per year; or you plan to construct a new installation or modify an existing major installation and the project has the potential to emit less than the minor levels per year, you may require an Air Minor Construction Permit to address potential air emissions. |
|
Air Part 70 Operating Permit
If your business has the potential to emit greater than 100 tons per year of any regulated pollutant, has the potential to emit greater than 100 tons per year of any single hazardous air pollutant, or greater than 25 tons per year of combined hazardous air pollutants, or is required by a New Source Performance Standard or a Maximum Achievable Control Technology, you may require an Air Part 70 Operating Permit. |
|
Airports Master General Stormwater Permit MOR80F000
If you own an airport facility that use de-icers or conduct uncovered vehicle or aircraft maintenance, washing or fueling, you are required to obtain an Airports Master General Stormwater Permit MOR80F000 to address stormwater discharges from the property. |
|
Fuel Spill Cleanup Permit (Petroleum Impacted Water Remediation) MOG940000
If your business discharges wastewater or stormwater associated with petroleum impacted water at any industrial or commercial facility, you must obtain a Petroleum Impacted Water Remediation MOG940000 master general permit. |
|
Hazardous Waste Generator Registration
If you produce or store some form of hazardous waste as a result of your business processes, you may be required to register as a hazardous waste generator. |
|
Land Application of Domestic Wastewater Biosolids Permit MOG821000
If your business land applies domestic septage onto agricultural land for beneficial use as fertilizer and soil amendment for a total volume up to 1,000,000 gallons per year, you must obtain a Land Application of Domestic Wastewater Biosolids MO-G821000 general permit. The land application must follow the approved Land Application Management Plan that conforms to the Best Management Practices and other requirements contained in the general permit. |
|
Land Application of Domestic Wastewater Permit MOG823000
If your business is a no-discharge, private or domestic wastewater treatment facility with design flows of less than 50,000 gallons per day and land apply the wastewater, design flows of less than 50,000 gallons per day and plan to land apply the wastewater, you must obtain a Land Application of Domestic Wastewater MOG823000 master general permit. |
|
Major Water Users
Missouri collects water use data to better understand and manage the state’s water inventory. A Major Water User is any person or entity that has the capability of producing a large amount of water (100,000 gallons per day or 70 gallons per minute or more) with all their combined wells or surface intakes. This water can be from either groundwater via a well, or surface water from a stream, river, lake, pond, or spring. Major Water Users are required by law to report the volume of water used by March 31 of the year following the usage. |
|
Public Drinking Water Construction Permit
If your business plans to construct a public water system that will supply drinking water to the public, you must obtain a Public Water Systems Construction Permit. You must obtain this permit if you also plan to complete the following construction projects to the water system: waterline extensions, waterline replacements, drilling water supply well, construction a storage tank, adding a disinfection system, treatment changes, building a pump station or other improvements or modifications. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit. |
|
Public Drinking Water Permit to Dispense
If your business plans to operate a public water system that supplies drinking water to the public, you must obtain a Public Water Systems Permit to Dispense. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit. |
|
Scrap Tire Collection Center
If your business plans to collect scrap tires prior to being offered for recycling or processing and plans to keep fewer than 500 scrap tires on-site at any time, your facility is not required to obtain a permit. However, there are exemptions and record keeping requirements. Also, the center shall be used only for the proper and temporary storage of scrap tires that will be removed for recovery or processing or for temporary storage at a permitted scrap tire processing facility for permanent disposal at a permitted solid waste disposal area. |
|
Site-Specific Industrial Stormwater Operating Permit
If your business is listed in 10CSR 20-6.200 by SIC code or description, you will need to apply for a Site-Specific Industrial Stormwater Operating Permit before you may operate, use or maintain the existing point source of water pollution. A Wastewater Construction Permit is required if constructing an earthen basin. |
|
Site-Specific Industrial Wastewater Operating Permit
If your business plans to discharge wastewater from a manufacturing process, you will need to apply for a Site-Specific Industrial Wastewater Operating Permit before you may operate, use or maintain the existing point source of water pollution. A Wastewater Construction Permit is required if constructing an earthen basin. |
|
Underground Petroleum Storage Tank Registration
If your business includes an underground storage tank on the property used to store either petroleum or certain hazardous substances or if you plan to have a tank installed for these reasons, you may be required to submit an Underground Storage Tank Registration with the department. |