The Missouri Department of Natural Resources describes an Agriculture business as:

Growing crops, raising livestock, forestry and fishery production; agriculture inputs and services; food and related products manufacturing; forestry products manufacturing; farming equipment manufacturers and food distribution companies.

You may need some or all of the following permits for an Agriculture business:

Waste icon
Above Ground Storage Tank Registration

Above ground storage tanks are regulated by the Missouri Department of Agriculture. For more information, please visit their Fuel Device Safety and Accuracy Program webpage.

Air icon
Air Intermediate Operating Permit

If your business is required to obtain a Part 70 Operating Permits but accepts voluntary, practically enforcement limitation to reduce emissions to less than 100 tons per year of any regulated pollutant and is less than 10 tons per year of any single hazardous air pollutant and less than 25 tons per year of any combined hazardous air pollutant, you may require an Air Intermediate Operating Permit to address potential air emissions.

Air icon
Air Major Construction Permit Sections (7), (8) & (9)

If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit more than major emission levels of a regulated air containment or construct a new installation or modify an existing major installation and the project has the potential to emit more than the minor levels per year, you may require an Air Major Construction Permit Sections (7), (8) & (9) to address potential air emissions.

Air icon
Air Part 70 Operating Permit

If your business has the potential to emit greater than 100 tons per year of any regulated pollutant, has the potential to emit greater than 100 tons per year of any single hazardous air pollutant, or greater than 25 tons per year of combined hazardous air pollutants, or is required by a New Source Performance Standard or a Maximum Achievable Control Technology, you may require an Air Part 70 Operating Permit.

Air icon
Air Permits-by-Rule Construction Permit

If your business operates a printing operation, crematory or animal incinerator, surface coating or livestock market, you may require an Air Permit-by-Rule Construction Permit to address potential air emissions. By applying for this permit rather than a De Minimis or Minor Construction Permit, your business agrees to certain conditions of operation.

Waste icon
Hazardous Waste/ Infectious Waste Transporter License

If you or your business plans to transport used oil, hazardous waste (combustible liquids, corrosives, poisons/ toxins, flammable liquids, flammable solids, PCB's) or infectious waste in Missouri, you are required to obtain a Hazardous Waste Transporter License.

Even though the request is approved by both Missouri Department of Transportation (MoDOT) and the Missouri Department of Natural Resources, you must apply for and renew the license through MoDOT. For more information, please visit MoDOT's Hazardous Waste Transport webpage.

Water icon
Major Water User Registration

If you or your business is capable of producing 100,000 gallons per day, or approximately 70 gallons per minute, including all wells or surface intakes, you are required to register with the department as a Major Water User. This registration is not for permitting purposes or to regulate water usage. Major water users are required by law to report the volume of water they used by March 31 of the year following the usage. Registration is required in order to submit reports.

The Major Water Users Program is established to simply gather water use data. Missouri collects water use data to better understand and manage the state’s water inventory. For more information, or to complete the online registration, please visit the Major Water Users webpage.

Water icon
Public Drinking Water Construction Permit

If your business plans to construct a public water system that will supply drinking water to the public, you must obtain a Public Drinking Water Construction Permit. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. This permit is also required if you plan to complete the following construction projects to the water system: waterline extensions, waterline replacements, drilling water supply well, construction a storage tank, adding a disinfection system, treatment changes, building a pump station or other improvements or modifications.

If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Water icon
Public Drinking Water Permit to Dispense

If your business plans to operate a public water system that supplies drinking water to the public, you must obtain a Public Drinking Water Permit to Dispense. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year.

Waste icon
Remedial Action Plan (RAP)

If you want to treat, store or dispose of hazardous remediation waste at a remediation waste management site in Missouri, you may be required to follow a Remedial Action Plan. The plan lists conditions about how to treat, store or dispose of hazardous remediation waste.

Waste icon
Underground Petroleum Storage Tank Registration

If your business includes an underground storage tank on the property used to store either petroleum or certain hazardous substances, or if you plan to have a tank installed for these reasons, you may be required to submit an Underground Storage Tank Registration with the department.