The Missouri Department of Natural Resources describes a Portland Cement Plant business as:
A facility that uses an energy intensive process to produce cement by grinding and heating a mixture of raw materials such as limestone, clay, sand and iron ore in a rotary kiln. The kiln is a large furnace that is fueled by coal, oil, gas, coke and various waste materials. The produced called clinker from the kiln is cooled, ground and then mixed with a small amount of gypsum to produce Portland cement.
You may need some or all of the following permits for a Portland Cement Plant business:
|
Air Intermediate Operating Permit
If your business is required to obtain a Part 70 Operating Permits but accepts voluntary, practically enforcement limitation to reduce emissions to less than 100 tons per year of any regulated pollutant and is less than 10 tons per year of any single hazardous air pollutant and less than 25 tons per year of any combined hazardous air pollutant, you may require an Air Intermediate Operating Permit to address potential air emissions. |
|
Air Major Construction Permit Sections (7), (8) & (9)
If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit more than major emission levels of a regulated air containment or construct a new installation or modify an existing major installation and the project has the potential to emit more than the minor levels per year, you may require an Air Major Construction Permit Sections (7), (8) & (9) to address potential air emissions. |
|
Air Minor Construction Permit Section (5)
If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit less than major source levels per year; or you plan to construct a new installation or modify an existing major installation and the project has the potential to emit less than the minor levels per year, you may require an Air Minor Construction Permit to address potential air emissions. |
|
Air Part 70 Operating Permit
If your business has the potential to emit greater than 100 tons per year of any regulated pollutant, has the potential to emit greater than 100 tons per year of any single hazardous air pollutant, or greater than 25 tons per year of combined hazardous air pollutants, or is required by a New Source Performance Standard or a Maximum Achievable Control Technology, you may require an Air Part 70 Operating Permit. |
|
Hazardous Waste Generator Registration
If you produce or store some form of hazardous waste as a result of your business processes, you may be required to register as a hazardous waste generator. |
|
Hazardous Waste Research, Development and Demonstration Permit
If your business owns or operates a hazardous waste treatment facility and wants to use new and experimental treatment technologies that do not fall under current regulation standards, you may apply for a Hazardous Waste Research, Development and Demonstration Permit. |
|
Hazardous Waste/ Infectious Waste Transporter License
If you or your business plans to transport hazardous waste including waste oil, explosives, gases, flammable and combustible liquids, flammable solids, oxidizers and organic peroxides, poisons, radioactive materials, corrosives or infectious waste, you must obtain a Hazardous/ Infectious Waste Transporter License. |
|
In-Stream Sand and Gravel Mining Permit
If your business plans to engage in surface mining of industrial minerals such as sand, gravel, limestone, dolomite, clay or other construction aggregates, you may need an Industrial Mineral Mines Permit – In-stream Sand and Gravel Mining to engage in surface mining. |
|
Land Application of Domestic Wastewater Permit MOG823000
If your business is a no-discharge, private or domestic wastewater treatment facility with design flows of less than 50,000 gallons per day and land apply the wastewater, design flows of less than 50,000 gallons per day and plan to land apply the wastewater, you must obtain a Land Application of Domestic Wastewater MOG823000 master general permit. |
|
Major Water User Registration
If you or your business is capable of producing 100,000 gallons per day, or approximately 70 gallons per minute, including all wells or surface intakes, you are required to register with the department as a Major Water User. This registration is not for permitting purposes or to regulate water usage. Major water users are required by law to report the volume of water they used by March 31 of the year following the usage. Registration is required in order to submit reports. The Major Water Users Program is established to simply gather water use data. Missouri collects water use data to better understand and manage the state’s water inventory. For more information, or to complete the online registration, please visit the Major Water Users webpage. |
|
Open Pit Mining Permit
If your business plans to remove topsoil and other soil material to expose the mineral commodity, you may need an Industrial Minerals Mines Permit - Open Pit Mining. Industrial mineral open pit mine sites range in size from one acre sand and gravel pits to 1,000 acre limestone sites. |
|
Public Drinking Water Construction Permit
If your business plans to construct a public water system that will supply drinking water to the public, you must obtain a Public Drinking Water Construction Permit. You must obtain this permit if you also plan to complete the following construction projects to the water system: waterline extensions, waterline replacements, drilling water supply well, construction a storage tank, adding a disinfection system, treatment changes, building a pump station or other improvements or modifications. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit. |
|
Public Drinking Water Permit to Dispense
If your business plans to operate a public water system that supplies drinking water to the public, you must obtain a Public Drinking Water Permit to Dispense. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit. |
|
Remedial Action Plan
If you want to treat, store or dispose of hazardous remediation waste at a remediation waste management site in Missouri, you may be required to follow a Remedial Action Plan. The plan lists conditions about how to treat, store or dispose of hazardous remediation waste. |
|
Scrap Tire Hauler Permit
If your business will haul scrap tires to processing facilities, you are required to apply for a Scrap Tire Hauler Permit. You will not be required to obtain a permit if your activity falls into one of the following categories, provided you do not create pollution, a public nuisance or a health hazard.
|