The Missouri Department of Natural Resources describes a Chemical and Allied Products Manufacturing/ Refining business as:

A business that manufactures and distributes paints, personal and household products, crop protection and public health products. The products are created by transforming organic and inorganic raw materials through a chemical processes. 

You may need some or all of the following permits for a Chemical and Allied Products Manufacturing/ Refining business:

Waste icon
Above Ground Storage Tank Registration

Above ground storage tanks are regulated by the Missouri Department of Agriculture. For more information, please visit their Fuel Device Safety and Accuracy Program webpage.

Air icon
Air Intermediate Operating Permit

If your business is required to obtain a Part 70 Operating Permits but accepts voluntary, practically enforcement limitation to reduce emissions to less than 100 tons per year of any regulated pollutant and is less than 10 tons per year of any single hazardous air pollutant and less than 25 tons per year of any combined hazardous air pollutant, you may require an Air Intermediate Operating Permit to address potential air emissions.

Air icon
Air Major Construction Permit Sections (7), (8) & (9)

If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit more than major emission levels of a regulated air containment or construct a new installation or modify an existing major installation and the project has the potential to emit more than the minor levels per year, you may require an Air Major Construction Permit Sections (7), (8) & (9) to address potential air emissions.

Air icon
Air Minor Construction Permit Section (5)

If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit less than major source levels per year; or you plan to construct a new installation or modify an existing major installation and the project has the potential to emit less than the minor levels per year, you may require an Air Minor Construction Permit to address potential air emissions.

Air icon
Air Part 70 Operating Permit

If your business has the potential to emit greater than 100 tons per year of any regulated pollutant, has the potential to emit greater than 100 tons per year of any single hazardous air pollutant, or greater than 25 tons per year of combined hazardous air pollutants, or is required by a New Source Performance Standard or a Maximum Achievable Control Technology, you may require an Air Part 70 Operating Permit.

Waste icon
Hazardous and Solid Waste Amendments Part 2 Permit

This is one of two possible permits that make up a hazardous waste permit. A Hazardous and Solid Waste Amendments Part 2 Permit contains the federal hazardous waste management regulations administered by EPA that Missouri has either not adopted or has adopted but EPA has not yet given Missouri temporary or final authorization to administer. This "Part 2" permit is issued by EPA, if warranted. EPA does not issue a Part 2 Permit if EPA has no site-specific conditions for that particular facility. Please visit the Hazardous Waste Permit.

Waste icon
Hazardous Waste Generator Registration

If you or your business produce or store some form of hazardous waste as a result of your business processes, you may be required to register as a hazardous waste generator.

Waste icon
Hazardous Waste Permit

If you or your business want to actively treat, store (for more than 90 days) or dispose of hazardous waste in Missouri, you are required to obtain a Hazardous Waste Permit. Certain “inactive” hazardous waste treatment, storage or disposal facilities may also be required to obtain a permit in order to investigate, monitor and clean up hazardous waste release to the environmental at their facility.

Waste icon
Hazardous Waste/ Infectious Waste Transporter License

If you or your business plans to transport used oil, hazardous waste (combustible liquids, corrosives, poisons/ toxins, flammable liquids, flammable solids, PCB's) or infectious waste in Missouri, you are required to obtain a Hazardous Waste Transporter License.

Even though the request is approved by both Missouri Department of Transportation (MoDOT) and the Missouri Department of Natural Resources, you must apply for and renew the license through MoDOT. For more information, please visit MoDOT's Hazardous Waste Transport webpage.

Waste icon
Missouri Hazardous Waste Management Facility Part 1 Permit

This is one of two possible permits that make up a hazardous waste permit. A Missouri Hazardous Waste Management Facility Part 1 Permit contains the federal hazardous waste management regulations Missouri adopted and EPA authorized Missouri to administer. This "Part 1" permit is issued by the Missouri Department of Natural Resources to all facilities obtaining a hazardous waste permit. Please go to Hazardous Waste Permit.

Water icon
Public Drinking Water Construction Permit

If your business plans to construct a public water system that will supply drinking water to the public, you must obtain a Public Drinking Water Construction Permit. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. This permit is also required if you plan to complete the following construction projects to the water system: waterline extensions, waterline replacements, drilling water supply well, construction a storage tank, adding a disinfection system, treatment changes, building a pump station or other improvements or modifications.

If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Water icon
Public Drinking Water Permit to Dispense

If your business plans to operate a public water system that supplies drinking water to the public, you must obtain a Public Drinking Water Permit to Dispense. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year.

Waste icon
Underground Petroleum Storage Tank Registration

If your business includes an underground storage tank on the property used to store either petroleum or certain hazardous substances, or if you plan to have a tank installed for these reasons, you may be required to submit an Underground Storage Tank Registration with the department.