A business where automobiles are repaired or serviced by auto mechanics and technicians.

You may need some or all of the following permits for a Auto Repair Shop:

Air icon
Air Intermediate Operating Permit

If your business is required to obtain a Part 70 Operating Permits but accepts voluntary, practically enforcement limitation to reduce emissions to less than 100 tons per year of any regulated pollutant and is less than 10 tons per year of any single hazardous air pollutant and less than 25 tons per year of any combined hazardous air pollutant, you may require an Air Intermediate Operating Permit to address potential air emissions.

Air icon
Air Major Construction Permit Sections (7), (8) & (9)

If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit more than major emission levels of a regulated air containment or construct a new installation or modify an existing major installation and the project has the potential to emit more than the minor levels per year, you may require an Air Major Construction Permit Sections (7), (8) & (9) to address potential air emissions.

Air icon
Air Minor Construction Permit Section (5)

If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit less than major source levels per year; or you plan to construct a new installation or modify an existing major installation and the project has the potential to emit less than the minor levels per year, you may require an Air Minor Construction Permit to address potential air emissions.

Air icon
Air Part 70 Operating Permit

If your business has the potential to emit greater than 100 tons per year of any regulated pollutant, has the potential to emit greater than 100 tons per year of any single hazardous air pollutant, or greater than 25 tons per year of combined hazardous air pollutants, or is required by a New Source Performance Standard or a Maximum Achievable Control Technology, you may require an Air Part 70 Operating Permit.

Water icon
Car Wash Permit MOG750000

If your business plans to operate a car wash that will include a wastewater treatment system with design flows of 50,000 gallons per day or less, which includes a no-discharge land application system and provides for 500 gallons per day de minimis exemption under certain conditions, you must obtain a Car Wash MO-G750000 general permit.

Water icon
Fuel Spill Cleanup Permit (Petroleum Impacted Water Remediation) MOG940000

If your business discharges wastewater or stormwater associated with petroleum impacted water at any industrial or commercial facility, you must obtain a Petroleum Impacted Water Remediation MOG940000 master general permit.

Waste icon
Hazardous Waste/ Infectious Waste Transporter License

If you or your business plans to transport hazardous waste including waste oil, explosives, gases, flammable and combustible liquids, flammable solids, oxidizers and organic peroxides, poisons, radioactive materials, corrosives or infectious waste, you must obtain a Hazardous/ Infectious Waste Transporter License.

Water icon
Public Drinking Water Construction Permit

If your business plans to construct a public water system that will supply drinking water to the public, you must obtain a Public Water Systems Construction Permit. You must obtain this permit if you also plan to complete the following construction projects to the water system: waterline extensions, waterline replacements, drilling water supply well, construction a storage tank, adding a disinfection system, treatment changes, building a pump station or other improvements or modifications. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Water icon
Public Drinking Water Permit to Dispense

If your business plans to operate a public water system that supplies drinking water to the public, you must obtain a Public Water Systems Permit to Dispense. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Waste icon
Scrap Tire Collection Center

If your business plans to collect scrap tires prior to being offered for recycling or processing and plans to keep fewer than 500 scrap tires on-site at any time, your facility is not required to obtain a permit. However, there are exemptions and record keeping requirements. Also, the center shall be used only for the proper and temporary storage of scrap tires that will be removed for recovery or processing or for temporary storage at a permitted scrap tire processing facility for permanent disposal at a permitted solid waste disposal area.