A real estate development is a multifaceted business, encompassing activities that range from the renovation of existing buildings to the purchase of land to clear and resale.
You may need some or all of the following permits for a Real Estate Development:
|
Asbestos Renovation and Demolition Notification Requirement
The department requires notification of demolitions and abatement projects involving regulated structures at least 10 working days before crews begin a project. To learn more, visit the department's Asbestos website. |
|
Land Application of Domestic Wastewater Permit MOG823000
If your business is a no-discharge, private or domestic wastewater treatment facility with design flows of less than 50,000 gallons per day and land apply the wastewater, design flows of less than 50,000 gallons per day and plan to land apply the wastewater, you must obtain a Land Application of Domestic Wastewater MOG823000 master general permit. |
|
Open Burning
Open burning is the burning of any materials in which air contaminants are emitted directly into the air without first passing through a stack or chimney. The department's fact sheet summarizes allowable and prohibited open burning under Missouri regulations. It does not include open burning restrictions that city or county governments may impose in addition to Missouri’s state regulations. Prior to conducting any open burning, businesses and citizens should contact the city or county of jurisdiction for any local restrictions. |
|
Public Drinking Water Construction Permit
If your business plans to construct a public water system that will supply drinking water to the public, you must obtain a Public Drinking Water Construction Permit. You must obtain this permit if you also plan to complete the following construction projects to the water system: waterline extensions, waterline replacements, drilling water supply well, construction a storage tank, adding a disinfection system, treatment changes, building a pump station or other improvements or modifications. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit. |
|
Public Drinking Water Permit to Dispense
If your business plans to operate a public water system that supplies drinking water to the public, you must obtain a Public Drinking Water Permit to Dispense. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit. |
|
Solid Waste Processing Facility Construction Permit
If your business plans to operate a facility where solid wastes are transferred from one container to another or are processed, you are required to apply for a Solid Waste Processing Facility Construction Permit. Types of processing facilities include incinerator, compost plant, infectious waste, transfer station and material recovery, with or without composting. |
|
Solid Waste Processing Facility Operating Permit
If your business plans to operate a facility where solid wastes are transferred from one container to another or are processed, you are required to apply for a Solid Waste Processing Facility Operating Permit. Types of processing facilities include incinerator, compost plant, infectious waste, transfer station and material recovery, with or without composting. |