A facility used to manufacture or process foods or beverages for human consumption, and certain related products, such as manufactured ice, chewing gum, vegetable and animal fats and oils, and prepared feeds for animals and fowls.

You may need some or all of the following permits for a Food and Kindred Products:

Air icon
Air Intermediate Operating Permit

If your business is required to obtain a Part 70 Operating Permits but accepts voluntary, practically enforcement limitation to reduce emissions to less than 100 tons per year of any regulated pollutant and is less than 10 tons per year of any single hazardous air pollutant and less than 25 tons per year of any combined hazardous air pollutant, you may require an Air Intermediate Operating Permit to address potential air emissions.

Air icon
Air Major Construction Permit Sections (7), (8) & (9)

If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit more than major emission levels of a regulated air containment or construct a new installation or modify an existing major installation and the project has the potential to emit more than the minor levels per year, you may require an Air Major Construction Permit Sections (7), (8) & (9) to address potential air emissions.

Air icon
Air Minor Construction Permit Section (5)

If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit less than major source levels per year; or you plan to construct a new installation or modify an existing major installation and the project has the potential to emit less than the minor levels per year, you may require an Air Minor Construction Permit to address potential air emissions.

Air icon
Air Part 70 Operating Permit

If your business has the potential to emit greater than 100 tons per year of any regulated pollutant, has the potential to emit greater than 100 tons per year of any single hazardous air pollutant, or greater than 25 tons per year of combined hazardous air pollutants, or is required by a New Source Performance Standard or a Maximum Achievable Control Technology, you may require an Air Part 70 Operating Permit.

Waste icon
Hazardous Waste/ Infectious Waste Transporter License

If you or your business plans to transport hazardous waste including waste oil, explosives, gases, flammable and combustible liquids, flammable solids, oxidizers and organic peroxides, poisons, radioactive materials, corrosives or infectious waste, you must obtain a Hazardous/ Infectious Waste Transporter License.

Water icon
Land Application of Domestic Wastewater Permit MOG823000

If your business is a no-discharge, private or domestic wastewater treatment facility with design flows of less than 50,000 gallons per day and land apply the wastewater, design flows of less than 50,000 gallons per day and plan to land apply the wastewater, you must obtain a Land Application of Domestic Wastewater MOG823000 master general permit.

Water icon
Land Application of Food Processing Wastewater Permit MOG822000

If your business plans to land apply or operate a subsurface dispersal system of wastes from industries such as light commercial food products industries or eating establishments onto grass land, crop land or timber land for use as a fertilizer and soil amendment, you must obtain a Land Application of Food Processing Wastewater MO-G822000 general permit. SIC# 20xx - Major Group - Food and Kindred Products, SIC# 202x - Dairy Products, SIC# 203x - Canned, Frozen and Preserved Fruits, Vegetables, and Food Specialties, SIC# 204x - Grain Mill Products, SIC# 205x - Bakery Products, SIC# 206x - Sugar and Confectionery Products

Water icon
Public Drinking Water Construction Permit

If your business plans to construct a public water system that will supply drinking water to the public, you must obtain a Public Water Systems Construction Permit. You must obtain this permit if you also plan to complete the following construction projects to the water system: waterline extensions, waterline replacements, drilling water supply well, construction a storage tank, adding a disinfection system, treatment changes, building a pump station or other improvements or modifications. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Water icon
Site-Specific Domestic Wastewater Operating Permit

If your business has received a Site-Specific Wastewater Construction Permit and has completed the construction project, you will need to apply for a Site-Specific Wastewater Operating Permit before you may operate, use or maintain the existing point source of water pollution.

Water icon
Site-Specific Industrial Stormwater Operating Permit

If your business is listed in 10CSR 20-6.200 by SIC code or description, you will need to apply for a Site-Specific Industrial Stormwater Operating Permit before you may operate, use or maintain the existing point source of water pollution. A Wastewater Construction Permit is required if constructing an earthen basin.

Water icon
Site-Specific Industrial Wastewater Operating Permit

If your business plans to discharge wastewater from a manufacturing process, you will need to apply for a Site-Specific Industrial Wastewater Operating Permit before you may operate, use or maintain the existing point source of water pollution. A Wastewater Construction Permit is required if constructing an earthen basin.

Water icon
Textile and Apparel/ Printing and Publishing Master General Stormwater Permit MOR130000

If your business produces paper and allied products, textiles and apparel products, printing and publishing operations and paper-only recycling, food and kindred products manufacturing operations, you must obtain a Textile and Apparel/ Printing and Publishing General Stormwater Permit MOR130000 to address stormwater discharges from the property.

Water icon
Wastewater Construction Permit

If your business plans to build, erect, alter or replace an existing or proposed point source, water contaminate source or wastewater treatment facility, you may need a Wastewater Construction Permit.