A concrete plant includes equipment that combines various ingredients such as water, air, sand, aggregate, fly ash or slag to form concrete.

You may need some or all of the following permits for a Concrete Batch Plant:

Air icon
Air Intermediate Operating Permit

If your business is required to obtain a Part 70 Operating Permits but accepts voluntary, practically enforcement limitation to reduce emissions to less than 100 tons per year of any regulated pollutant and is less than 10 tons per year of any single hazardous air pollutant and less than 25 tons per year of any combined hazardous air pollutant, you may require an Air Intermediate Operating Permit to address potential air emissions.

Air icon
Air Major Construction Permit Sections (7), (8) & (9)

If your business plans to construct a new installation or modify an existing minor installation and the project has the potential to emit more than major emission levels of a regulated air containment or construct a new installation or modify an existing major installation and the project has the potential to emit more than the minor levels per year, you may require an Air Major Construction Permit Sections (7), (8) & (9) to address potential air emissions.

Air icon
Air Part 70 Operating Permit

If your business has the potential to emit greater than 100 tons per year of any regulated pollutant, has the potential to emit greater than 100 tons per year of any single hazardous air pollutant, or greater than 25 tons per year of combined hazardous air pollutants, or is required by a New Source Performance Standard or a Maximum Achievable Control Technology, you may require an Air Part 70 Operating Permit.

Waste icon
Hazardous Waste Research, Development and Demonstration Permit

If your business owns or operates a hazardous waste treatment facility and wants to use new and experimental treatment technologies that do not fall under current regulation standards, you may apply for a Hazardous Waste Research, Development and Demonstration Permit.

Water icon
Land Application of Domestic Wastewater Permit MOG823000

If your business is a no-discharge, private or domestic wastewater treatment facility with design flows of less than 50,000 gallons per day and land apply the wastewater, design flows of less than 50,000 gallons per day and plan to land apply the wastewater, you must obtain a Land Application of Domestic Wastewater MOG823000 master general permit.

Agency General icon
Major Water Users

Missouri collects water use data to better understand and manage the state’s water inventory.  A Major Water User is any person or entity that has the capability of producing a large amount of water (100,000 gallons per day or 70 gallons per minute or more) with all their combined wells or surface intakes. This water can be from either groundwater via a well, or surface water from a stream, river, lake, pond, or spring. 

Major Water Users are required by law to report the volume of water used by March 31 of the year following the usage.

Water icon
Public Drinking Water Construction Permit

If your business plans to construct a public water system that will supply drinking water to the public, you must obtain a Public Water Systems Construction Permit. You must obtain this permit if you also plan to complete the following construction projects to the water system: waterline extensions, waterline replacements, drilling water supply well, construction a storage tank, adding a disinfection system, treatment changes, building a pump station or other improvements or modifications. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Water icon
Public Drinking Water Permit to Dispense

If your business plans to operate a public water system that supplies drinking water to the public, you must obtain a Public Water Systems Permit to Dispense. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Waste icon
Scrap Tire Hauler Permit

If your business will haul scrap tires to processing facilities, you are required to apply for a Scrap Tire Hauler Permit. You will not be required to obtain a permit if your activity falls into one of the following categories, provided you do not create pollution, a public nuisance or a health hazard.

  1. A person who does not haul for monetary or non-monetary compensation or commercial profit.
  2. A person hauling warranty tires or new defective tires to the retailer, wholesaler or manufacturer for adjustment credit or return.
  3. A person hauling scrap tires that have been generated at their own business or residence, provided this transportation is done using their own employees and vehicles.
Agency General icon
Solid Waste Exemptions

Your business may be eligible to receive a Solid Waste Exemption. Certain waste materials may be salvaged for continued use, or recovered and reused for another purpose that extends the value of that materials. Some waste recovery, reuse or repurposing activities may not require a permit, as long as the activity does not cause a hazard to human health, a hazard to the environment or a public nuisance. Although the activities may be exempt from solid waste permitting requirements, there may be criteria you must meet to be granted this exemption. Examples of common activities and wastes include beneficial use, clean fill, composting, construction and demolition waste, NORM and TENORM. Learn more by visiting the department's Activities Potentially Exempt from Solid Waste Regulations.