An individual or business that spreads biosolids for beneficial use. Biosolids are a product of the wastewater treatment process. During wastewater treatment the liquids are separated from the solids. Those solids are then treated physically and chemically to produce a semisolid, nutrient-rich product known as biosolids. The terms ‘biosolids’ and ‘sewage sludge’ are often used interchangeably. Biosolids that are land applied must meet federal and state requirements.

You may need some or all of the following permits for a Biosolids Applicator:

Waste icon
Hazardous Waste Emergency Permit

If your business or the department has identified an immediate and significant threat to human health or the environment based on hazardous waste issues at your facility, the department may issue a Hazardous Waste Emergency Permit. The department may issue an emergency permit to a company that already has a hazardous waste permit, to allow them to treat, store or dispose of a hazardous waste not covered by their effective permit. The department may also issue an emergency permit to non-permitted companies, to allow them to temporarily treat, store or dispose of hazardous waste. The emergency permit clearly specifies the hazardous wastes the company intends to handle and how they are allow to treat, store or dispose of the wastes. An emergency permit can be effective for up to 90 days.

Water icon
Public Drinking Water Construction Permit

If your business plans to construct a public water system that will supply drinking water to the public, you must obtain a Public Water Systems Construction Permit. You must obtain this permit if you also plan to complete the following construction projects to the water system: waterline extensions, waterline replacements, drilling water supply well, construction a storage tank, adding a disinfection system, treatment changes, building a pump station or other improvements or modifications. A public water system has at least 15 service connections or serves at least 25 people at least 60 days out of the year. If your business plans to connect to a permitted public water system, then you are not required to obtain this permit.

Water icon
Sewer Extension Construction Permit

If your business plans to construct a gravity sewer extension, force main and lift station, you may need a site-specific Sewer Extension Construction Permit. You may also need this permit if you plan to construct a non-earthen flow equalization storage basin at a lift station and an inline storage.