Updated Sept. 29, 2020

Email swmp@dnr.mo.gov if you have questions about document availability

Air Sampling

As of July 16, 2018, the Missouri Department of Natural Resources has transitioned routine air monitoring activities to Republic Services, Inc. and Bridgeton Landfill, LLC. Air monitoring data is still available at the Republic Services webpage. Click here for more information about the air monitoring transition. (posted 10/30/18)

Weekly Reporting

Weekly Data Submittals are required to be submitted by Bridgeton Landfill to the department and include:

Weekly Heat Removal Pilot Study

Monthly Reporting

Facility Status Report required to be submitted to the Court by Republic Services.

Monthly Data Submittals to the department are required to include:

Neck Heat Extraction System Monthly Report -- As required per the department’s Dec. 4, 2015, approval letter for the November 2015 Technical Evaluation of the Heat Extraction Barrier and as incorporated into the EPA’s April 28, 2016, Administrative Settlement Agreement and Order on Consent for Removal Actions, Bridgeton Landfill shall submit a monthly report to the department on the operation and effectiveness of the heat extraction barrier.

Quarterly Reporting

First Agreed Order (13SL-CC01088) Compliance Reporting

Reports submitted by Republic Services for Bridgeton Landfill:

Air Monitoring for Volatile Organic Compounds (VOCs)

Quarterly Slope and Stability Assessment Reports

Landfill Gas Corrective Action Plan Updates

Quarterly As-Built Drawings (To be filed with the department within 30 days after the last day of each quarter)

As-built drawings of infrastructure changes since previous quarterly submittal, if any.

As-built drawings of infrastructure changes for the Leachate Collection Sump LCS-5B

Groundwater Reports

No 2020 groundwater reports at this time. Previous reports are available in archives.

Other Reports and Work Plans

 

Gas Collection and Control System Expansion

Condensate Trap Construction Quality Assurance Report

Heat Extraction Barrier Annual Performance Report

Heat Extraction System As-Built Drawing

Incident Management Plan

North Quarry Ethylene Vinyl Alcohol (EVOH) Cover System

North Quarry Temperature Monitoring Probes Installation Drawings

North Quarry Settlement Survey

North Quarry 2019 Amphitheater Fill Project

Soil Gas Monitoring

South Quarry Proposed GCCS Improvements

South Quarry Fill Projects

South Quarry Subsurface Assessment Actions and Leachate Collection Sump Installations Work Plan

  • Nov. 15, 2019 - Subsurface Conditions Monitoring for Leachate Collection System Installations. View the report. (posted 11/20/19)
  • Sept. 18, 2018 - Bridgeton Landfill submitted the final response letter to the work plan. View the report. (posted 09/25/18)
  • July 2018 (posted 08/10/18)

Stormwater Evaluation Reports

Perimeter Extraction Well (PEW) Abandonment

Replacement Temperature Monitoring Probe As-Built

 

  • * Adobe Acrobat Reader is required to view the PDF publications.  If you do not have Adobe Acrobat Reader, click here to download it for free.