Updated Feb. 15, 2017

 

Air Monitoring

Jan. 19, 2017 -- Daily Results -- Air monitoring activities continue as the department collects data via our AreaRAE system on a 24 hour per day/7 day per week basis. Daily monitoring events by the department continue to be completed twice per day on a scheduled path.

newJan. 16 - Jan. 19, 2017

newJan. 12 - Jan. 16, 2017

newJan. 9 - Jan. 12, 2017

newJan. 5 - Jan. 9, 2017

Jan. 2 - Jan. 5, 2017

Dec. 29, 2016 - Jan. 2, 2017

Dec. 26 - Dec. 29, 2016

Dec. 22 - Dec. 26, 2016

Dec. 19 - Dec. 22, 2016

 

Air Sampling

Nov. 22, 2016 -- Weekly and Monthly Results-- Air sampling activities continue on a weekly basis by the department and total reduced sulfur sampling occurs on a monthly basis.

newNov. 15, 2016 - Weekly Air Sampling

newNov. 8, 2016 - Weekly Air Sampling

newNov. 2, 2016 - Weekly Air Sampling

newNov. 1, 2016 - Monthly Air Sampling for Total Reduced Sulfur Compounds

newOct. 25, 2016 - Weekly Air Sampling

Oct. 18, 2016 - Weekly Air Sampling

Oct. 11, 2016 - Weekly Air Sampling

Oct. 5, 2016 - Monthly Air Sampling for Total Reduced Sulfur Compounds

Oct. 4, 2016 - Weekly Air Sampling

Sept. 28, 2016 - Weekly Air Sampling

Sept. 21, 2016 - Weekly Air Sampling

Sept. 13, 2016 - Weekly Air Sampling


First Agreed Order (13SL-CC01088) Compliance Reporting

Reports submitted by Republic Services for Bridgeton Landfill:

Jan. 27, 2017 -- Republic Services submitted for Bridgeton Landfill the following reports:

Sept. 30, 2016 -- Republic Services submitted the Bridgeton Landfill Gas Corrective Action Update as required for compliance with the First Agreed Order

Quarterly (To be filed with the department within 30 days after the last day of each quarter)

As-built drawings of infrastructure changes since previous quarterly submittal, if any.

Weekly Reporting

Weekly Data Submittals are required to be submitted by Bridgeton Landfill to the department and include:

Monthly Reporting

Facility Status Report required to be submitted to the Court by Republic Services.

Monthly Data Submittals to the department are required to include:

Neck Heat Extraction System Monthly Report -- As required per the department’s Dec. 4, 2015 approval letter for the November 2015 Technical Evaluation of the Heat Extraction Barrier and as incorporated into the EPA’s April 28, 2016 Administrative Settlement Agreement and Order on Consent for Removal Actions (ASAOC), Bridgeton Landfill shall submit a monthly report to the department on the operation and effectiveness of the heat extraction barrier

Neck Heat Extractions System As-Built Drawings

Inert Gas Injection Reports

Groundwater Reports

  • newFeb. 3, 2017 -- Bridgeton Landfill submitted the Fourth Quarter 2016 Groundwater Statistical Analysis Report. View the report. (02/14/17)
  • Dec. 27, 2016 -- Fourth Quarter 2016 Assessment Monitoring Event Summary Report. View the report. (01/10/17)
  • Nov. 9, 2016 -- Bridgeton Landfill submitted the Third Quarter 2016 Groundwater Statistical Analysis Report. View the report. (11/14/16)
  • Nov. 4, 2016 -- Bridgeton Landfill's 2016 Annual Assessment Monitoring Report Addeneum. View the report. (11/14/16)
  • Oct. 14, 2016 -- Groundwater and leachate monitoring, sampling and analysis continues at and around the Bridgeton Landfill on a quarterly basis. For the February-March 2016, May-June 2016, and August-September 2016 sampling events, the state added Tritium to the list of constituents to be analyzed in the samples. The laboratory analysis reports for those three sampling events are now posted below. Additionally, the State obtained an order from the Special Master and the Court presiding over the litigation permitting it to sample groundwater wells located in OU-1, Area 1, so that those samples could also be analyzed for the same constituents, including Tritium.
  • Sept. 1, 2016 -- Bridgeton Landfill submitted the Second Quarter 2016 Groundwater Statistical Analysis Report.View the report. (09/23/16)
  • Aug. 29, 2016 -- Bridgeton Landfill's 2016 Annual Assessment Monitoring Report. View the report. (09/23/16)
Other Reports
  • newDecember 2016 -- Bridgeton Landfill submitted as-built drawings for temperature monitoring probe installation in the North Quarry. View the drawings. (01/06/07)
  • Oct. 20, 2016 -- Bridgeton Landfill submitted the facility's update to the Heat Removal Pilot Study. View the quarterly report. (10/27/16)
  • Sept. 27, 2016 -- The department issued a comment letter to EPA regarding Corrective Action Measures: Inert Gas Injection Work Plan for Hot Spot Remediation. View the letter. (10/04/16)
  • July 27, 2016 -- Bridgeton Landfill submitted the 2nd Quarter Slope Stability Analysis Report. View the report. (07/29/16)
  • July 20, 2016 -- Bridgeton Landfill submitted the facility's update to the Heat Removal Pilot Study. View the quarterly report. (07/20/16)

Disclaimer

This website is updated as information becomes available. Every effort is made to keep the page current. If you have questions about document availability send an email to swmp@dnr.mo.gov.

* Adobe Acrobat Reader is required to view the PDF publications.  If you do not have Adobe Acrobat Reader, click here to download it for free.