Updated June 21, 2017

Email swmp@dnr.mo.gov if you have questions about document availability

Air Monitoring

June 8, 2017 -- Daily Results -- Air monitoring activities continue as the department collects data via our AreaRAE system on a 24 hour per day/7 day per week basis. Daily monitoring events by the department continue to be completed twice per day on a scheduled path.

newArea Rae data is not available for the timeframe between May 22 - 25. Department of Natural Resources staff conducted real time screening of the incoming Area Rae data per our normal daily operations. However, during the download process a software corruption problem was discovered. The department uses Rae Systems Pro Rae Guardian software for storage and download of the Area Rae data over the Internet. Through discussions with Rae Systems, developer of the software, department staff were informed that the Pro Rae Guardian software service was attacked with Ransomware. This attack resulted in the temporary loss of service for most if not all users of this online software. The loss in service did not affect any previously stored or downloaded data. The department has since made repairs to the software so that data storage and downloading is again functional.       

During that time frame, the department increased field staff presence in the area and continued to conduct daily monitoring loops with handheld equipment as normal. No action levels were reached during this time frame. Additionally, there were no observed interruptions to the landfill daily operations or any type of intrusive work being conducted that would be expected to cause an increase in odors/air emissions. 

newJune 12 - 15, 2017

newJune 8 - 12, 2017

June 5 - 8, 2017

June 1 - 5, 2017

May 29 - June 1, 2017

May 25 - 29, 2017

May 22 - 25, 2017

May 18 - 22, 2017

May 15 - 18, 2017

May 11 - 15, 2017

May 8 - 11, 2017

May 4 - 8, 2017

May 1 - 4, 2017

April 27 - May 1, 2017

April 24 - 27, 2017

 

Air Sampling

April 7, 2017 -- Weekly and Monthly Results -- Air sampling activities continue on a weekly basis by the department and total reduced sulfur sampling occurs on a monthly basis.

March 31, 2017 - Weekly Air Sampling

March 21, 2017 - Weekly Air Sampling

March 15, 2017 - Weekly Air Sampling

March 9, 2017 - Monthly Air Sampling for Total Reduced Sulfur Compounds

March 8, 2017 - Weekly Air Sampling

Feb. 28, 2017 - Weekly Air Sampling

Feb. 22, 2017 - Weekly Air Sampling

Feb. 16, 2017 - Weekly Air Sampling

Feb. 8, 2017 - Monthly Air Sampling for Total Reduced Sulfur Compounds

Feb. 7, 2017 - Weekly Air Sampling

 

First Agreed Order (13SL-CC01088) Compliance Reporting

Reports submitted by Republic Services for Bridgeton Landfill:

April. 27, 2017 -- Republic Services submitted for Bridgeton Landfill the following reports:

April 15, 2017 -- Republic Services submitted the Bridgeton Landfill Gas Corrective Action Update as required for compliance with the First Agreed Order

Quarterly (To be filed with the department within 30 days after the last day of each quarter)

As-built drawings of infrastructure changes since previous quarterly submittal, if any.

Weekly Reporting

Weekly Data Submittals are required to be submitted by Bridgeton Landfill to the department and include:

Monthly Reporting

Facility Status Report required to be submitted to the Court by Republic Services.

Monthly Data Submittals to the department are required to include:

Neck Heat Extraction System Monthly Report -- As required per the department’s Dec. 4, 2015 approval letter for the November 2015 Technical Evaluation of the Heat Extraction Barrier and as incorporated into the EPA’s April 28, 2016 Administrative Settlement Agreement and Order on Consent for Removal Actions (ASAOC), Bridgeton Landfill shall submit a monthly report to the department on the operation and effectiveness of the heat extraction barrier

Neck Heat Extractions System As-Built Drawings

Inert Gas Injection Reports

Groundwater Reports

  • May 4, 2017 -- Bridgeton Landfill submitted the First Quarter 2017 Groundwater Statistical Analysis Report. View the report. (05/16/17)
  • March 9, 2017 -- February 2017 Groundwater Sample Results (03/20/17)
  • Feb. 3, 2017 -- Bridgeton Landfill submitted the Fourth Quarter 2016 Groundwater Statistical Analysis Report. View the report. (02/14/17)
  • Dec. 27, 2016 -- Fourth Quarter 2016 Assessment Monitoring Event Summary Report. View the report. (01/10/17)
  • Nov. 23, 2016 -- November 2016 Groundwater Sample Results (03/20/17)
Other Reports
  • December 2016 -- Bridgeton Landfill submitted as-built drawings for temperature monitoring probe installation in the North Quarry. View the drawings. (01/06/17)
  • Oct. 20, 2016 -- Bridgeton Landfill submitted the facility's update to the Heat Removal Pilot Study. View the quarterly report. (10/27/16)