Important Site Specific Documents

Final Sampling and Analysis Plan for Remediation of Operable Unit 1, Revision 1.5

Westinghouse Electric Company, L.L.C., Hematite Facility, March 2015

Remedial Design Work Plan, - Operable Unit 1

Westinghouse Electric Company, L.L.C., Hematite Facility, August 2011

Interim Groundwater Monitoring Plan, Revision 3,
Westinghouse Electric Company LLC, Hematite Facility, March 2012

Record of Decision - Operable Unit 1 - Buried Waste, Impacted Soils and Sediment,
Westinghouse Electric Company LLC, Former Fuel Cycle Facility, Hematite, Mo, May 18, 2009

Proposed Plan - Operable Unit 1 - Buried Waste, Impacted Soils and Sediment, June 25, 2008

Remedial Investigation Report for the Westinghouse Hematite Site, Vol. 1, January 2007
The entire document is available to download using the link above.

The publication is divided into chapters for quicker download for those using a slower Internet connection.

Remedial Investigation Report for the Westinghouse Hematite Site, Vol. 2, January 2007

The publication is divided into chapters for quicker download for those using a slower Internet connection.

Baseline Human Health Risk Assessment, January 2007

The publication is divided into chapters for quicker download for those using a slower Internet connection.

Screening Level Ecological Risk Assessment, January 2007

The publication is divided into chapters for quicker download for those using a slower Internet connection.

Buried Waste Evaluation Report, March 2007

Remedial Investigation Work Plan, Revision '0' Report for the Westinghouse Electric Company. Prepared by Leggette, Brashears and Graham Inc., May 9, 2003

Remedial Investigation Work Plan, Revision '0', accompanying drawings for the Westinghouse Electric Company

Engineering Evaluation and Cost Analysis for Removal Actions on Buildings and Equipment, 4 MB September 2004

Engineering Evaluation and Cost Analysis for Deul's Mountain, 4.7 MB August 2004

Engineering Evaluation and Cost Analysis Response Action for Off-Site Groundwater 2.5 MB

Final Responsiveness Summary

Non-Time-Critical Removal Action Memorandum